Mandalay Resources Cuffley High Voltage Substation
Mandalay Resources, Victoria.
Design,Supply & Installation of 22/11KV 2.5MVA High Voltage Substation. Turn Key Project.
Surface Installation
- 1 x 22KV metering cubicle/RMU - ABB -
- 1 X 22/11KV 2.5MVA Tx
- 1 x 415v/11KV 1MVA Tx
- 1 X 11KV/415V 100KVA Tx
- 2 X 11KV 254ohm NERs
- 1 X Protection panel and UPS supply
- 2 X 11KV RMUs - Schneider RM6
- 1 x Installation of fibre optic panel
- 1 X General light and power
- 1 X Earth grid
- 1 X All civil, fencing and buildings
Underground Mine Installation
- 1 X 11KV 70mm cable installation in 240mtr shaft - total length 400mtrs
- 1 X Optic fibre and Leaky feeder installation in shaft 240mtrs
- 1 X Supply and Install 1.5MVA UG substation 11KV/1KV
- 1 X All civil, fencing.