* Haymes Paint site plant upgrade
Haymes Paint Production Expansion Project 2014/15
Haymes Paint engaged Compliance contracting for their plant upgrade which was fully manually operated to automated system. Works involved Electrical, Civil and Mechanical.
- Mains cable 3 x 500mm Aluminum cable
- Metering panel
- MCC 1000amp rated
- Field wiring
- PLC design and installation
- Remote control panel
- Piping installation
- Civil foundations for project